青青色综合_日日射天天射_久久精品国产字幕高潮_91在线公开视频_久久久久久久久久久网站_欧美人成免费网站

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1910

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
主站蜘蛛池模板: 久治县| 陈巴尔虎旗| 浮梁县| 焦作市| 毕节市| 黄大仙区| 都昌县| 盖州市| 黔东| 陵水| 廉江市| 河东区| 江门市| 新闻| 界首市| 苍溪县| 隆林| 毕节市| 侯马市| 内黄县| 湟源县| 舞钢市| 拉孜县| 山阳县| 修水县| 阜宁县| 安徽省| 出国| 中西区| 恭城| 舒城县| 巴青县| 大邑县| 樟树市| 合作市| 家居| 茂名市| 阜新市| 旬阳县| 平南县| 齐齐哈尔市|