青青色综合_日日射天天射_久久精品国产字幕高潮_91在线公开视频_久久久久久久久久久网站_欧美人成免费网站

NewsHome > News > Industry dynamics

How many meters can a concrete paver spread a day?
release time:2019-11-14 15:38:00      hit count:2225

圖片2(1).jpg

How many meters can a concrete paver spread a day? The specific number of meters that can be paved is not fixed. It depends on the specific project, the difficulty of the project, and the on-site feeding, the cooperation of the workers, and many factors. And there are weather conditions. Specific engineering specific analysis.

1. Is the personnel scheduling reasonable?

2. Whether the various machines are working properly.

3. Paving the width and thickness of the pavement

4. Paver operator proficiency

5. Model configuration of paver

6. Weather

7. Construction environment (such as the distance of the material yard, the size of the transport vehicle, etc.), etc.

Therefore, how many meters can be spread in a day, there is no way to calculate, generally slow progress can also spread about 500 meters, the speed is fast, 2-3 kilometers a day also.

Welcome information Xuzhou New Road Intelligent Technology Co., Ltd.

Xuzhou Xinlu Intelligent Technology Co., Ltd. was established on January 31, 2019. It is a modern intelligent technology company jointly established by Xuzhou Xinluyuan Machinery Technology Co., Ltd. and Jiangsu Jiji Road Engineering Technology and Equipment Research Institute Co., Ltd.

The company is mainly engaged in multi-functional cement concrete slipform paver, curb stone slipform paver, roadside stone forming machine, water strip sliding mold machine, shoulder molding machine, New Jersey anti-collision guardrail forming machine and other cement concrete pavement maintenance equipment. R & D, manufacturing and sales; provide a variety of cement concrete anti-collision guardrails, gutters, shoulders, curbs / roadside stone and other structural sliding form construction plans; research and extension of the foundation and new materials in cement concrete sliding form Application in paving construction.

圖片3(1).jpg


Previous: How many meters can the curb stone slide be made a day? How is the construction efficiency?
Next: The role of concrete additives in improving concrete sliding form construction

Back to list

News you are interested in
主站蜘蛛池模板: 望都县| 新平| 镇康县| 社旗县| 朝阳县| 洛隆县| 木兰县| 庆城县| 苍溪县| 商洛市| 中卫市| 西乌珠穆沁旗| 中西区| 黄陵县| 监利县| 灯塔市| 基隆市| 阳高县| 民勤县| 南乐县| 金山区| 申扎县| 忻城县| 偏关县| 广东省| 新竹县| 赞皇县| 遂溪县| 沾益县| 沙坪坝区| 尉犁县| 中江县| 徐汇区| 寿光市| 正蓝旗| 岳阳县| 南宁市| 宝丰县| 彭山县| 吴川市| 海安县|